Easy Fiber
Connector Assembly Instructions
1. Ferrule protective sheath removal
- Cut at the end of the yellow heatshrink.
- Remove red adhesive tape.
- Gently slide the sheath along the fiber by gripping the initial part of the sheath.
2. Cable sheath removal
- Pulling from the two flaps, strip the pre-engraved sheath to the required length so that the fiber can be easily handled.
- Cut off the sheath and exceding kevlar
3. Inner body insertion
- Insert the inner body by sliding it behind the green pigtail
4. Flange insertion
- Insert the flange, paying attention to the red mark on the ferrule holder
5. Flange – inner body coupling
- Couple the inner body and the flange. The slot of the inner body and the tag of the flange must be aligned.
- Remove the flange tag
6. Connector finalization
- Insert the external body by aligning the slot of the inner body with the notch.
- The connectorization is successfully completed when you hear a click.
- Remove the ferrule temporary protection and insert the green cap.